Software for roofing, façade and insulation companies
Roofers, dormers, window frames and façade elements, glazing, solar shading and insulation. Your crews are somewhere different every day. A lot of material goes on each job sheet. Lead times drive your schedule, and at handover a photo is the proof. Platrom puts that on one board and lets the job sheet carry the proof.
Where it goes wrong today
Four things we hear back in nearly every conversation. If none of them sound familiar, you probably do not need this system.
What Platrom does about it
With the module named, because a solution without a name is a promise. Everything below is in the system and can be seen in a demo.
A 480 m² roof refurbishment
From enquiry to handover, with the photos that prevent the argument.
- Tue 11:40
The quote goes out with a provisional sum for the rainwater goods. The client signs online. The work is waiting as a job with the budget underneath it.
- Wed 06:55
On the planning board two crews are set for Thursday and Friday. The lead time on the roof covering is shown with it. So the clash with the next job is visible on Wednesday already.
- Thu 07:30
The crew sees the address, the site, the history and how to get onto the roof. The first photos of the existing situation go straight onto the job sheet.
- Thu 14:15
Under the old layer there are two rotten boards. The variation goes on and the clerk of works signs on the spot. With a photo attached. No argument in week three.
- Fri 16:41
Handover. Photos of the finished area, signature from the client, sheet closed. The invoice can go out that same evening.
Questions from this trade
Can we schedule per crew rather than per person?
Yes. A work order goes to the people working on it, and on the board you see the load per week. The empty row at the bottom is the most important part of it. That is the capacity you can still sell.
How many photos can go on a job sheet?
As many as the work calls for. They belong to the sheet and therefore to the site. You find them again later through the address and not only through the date. That is what makes them usable in an argument a year later.
We also run maintenance contracts on roofs. Does that fit?
Yes. That is the same module installation companies run their service visits on. You set a maintenance interval per site. If a visit falls behind, it is flagged. Statutory inspections sit separately.
Questions about price, notice period, integrations and where your data is held are on the pricing page and on Data and security.
Do you work in another trade?
Any technical company with people out in the field and an invoice it has to be able to explain fits here. These are the other four.
Half an hour, on your own work
Bring one of your own projects. A breakdown, a refurbishment or a contract. We walk it through the system, from enquiry to invoice line.