Skip to content

All configurators

Roof replacement configurator

Pitched or flat, from stripping the old covering to insulating and finishing. The edge details and the disposal sit separately, because on a roof that is where two quotes differ.

For roofers and maintenance firms

What it asks

  1. 1Which roof
  2. 2Build-up and insulation
  3. 3Edge work and finish

What comes out

  • A quote with the lines set out separately, ready to send
  • On the veranda and the dormer window, a sketch with the dimensions on it
  • The survey kept, so a second visit is not a second survey
  • On solar panels and insulation, the grant shown separately so the customer sees both figures

Does stripping the old covering count?

Yes, as its own line with the quantity on it. That is usually the item missing from a cheaper quote and the one the customer pays for later anyway.

The amounts sit in your own environment and not in our code. You set your own labour rate, your own material prices and your own uplifts, and you do not wait for a release to do it.

Have a look at one

In the demo we price up a job you quoted this week. Then you see straight away whether the questions are right for your trade.

Request a demo