EV charge point configurator
Wall box or post, with the cable route, the circuit and load balancing. The distance from the consumer unit to the charge point decides the price more than the unit itself does.
For electrical contractors
What it asks
- 1The charge point
- 2From consumer unit to charge point
- 3Consumer unit
What comes out
- A quote with the lines set out separately, ready to send
- On the veranda and the dormer window, a sketch with the dimensions on it
- The survey kept, so a second visit is not a second survey
- On solar panels and insulation, the grant shown separately so the customer sees both figures
Does it look at the consumer unit?
Yes. Whether there is room for a circuit and whether the supply can take it are questions in the survey. Without those two, a price for a charge point is a guess.
The amounts sit in your own environment and not in our code. You set your own labour rate, your own material prices and your own uplifts, and you do not wait for a release to do it.
Have a look at one
In the demo we price up a job you quoted this week. Then you see straight away whether the questions are right for your trade.